Skip to main content
AS 3745 Aligned · Australia-wide
Industries

Evacuation diagrams for offices and commercial buildings

AS 3745-compliant evacuation diagrams for office buildings, co-working spaces, and commercial premises across Australia. Remote service, fast delivery.

Multi-tenancy boundaries, mid-tenancy reconfiguration, server room isolation, after-hours coverage, audit checklist. Free, instant download.
Section 01

Overview

EvacPath makes AS 3745-compliant evacuation diagrams for offices and commercial buildings from A$70 per diagram (Basic A$280 for up to 4 diagrams, Standard A$420 for up to 8), delivered as print-ready PDFs in 3 to 5 business days with no site visit. You see your first draft before you pay.

Every office is a workplace, and work health and safety law requires a workplace to have an emergency plan (Victoria has its own OHS laws). Evacuation diagrams are the part of that plan people see on the wall. Whether you manage a single-floor office or a multi-storey commercial tower, diagrams drawn to AS 3745 show exit routes, fire equipment, and assembly points for all occupants and visitors.

Section 02

Why offices need diagrams

  • Offices have high foot traffic with visitors who are unfamiliar with the layout
  • Multi-tenancy buildings may need diagrams for each tenanted area plus common areas
  • Building managers and landlords are typically responsible for compliance
  • Fire safety audits by council or insurers will check for current diagrams
  • Workplace health and safety obligations require emergency preparedness
Section 03

Where to install diagrams

  • Main reception and entry points
  • Each floor near lifts and fire stairs
  • Kitchen and break room areas
  • Conference rooms and meeting areas
  • Near emergency exits on each level
Section 04

Common challenges

Office layouts change frequently as tenants move, walls are reconfigured, and equipment is relocated. Diagrams need to be updated when the layout changes, which makes a fast, affordable remote service particularly valuable.

Section 05

How EvacPath helps

  • Work from your existing floor plans or building management drawings
  • Deliver print-ready PDFs in 3 to 5 business days
  • Easy to reorder updated diagrams when your layout changes
  • Transparent pricing with no site visit fees
What clients say
Read case studies
“We were fitting out a new clinic and needed evacuation diagrams before opening. John drew them from our architect's plan, no site visit needed, and the first draft was with us within days. Really easy.”
A cosmetic clinic owner, Hobart, Tas.Cosmetic clinic, 4 diagrams
“We needed five evacuation plans for a client's three-level office fit-out. John drew them from the designer's as-built drawings, no site visit, and the set went to our client the day it arrived. John was responsive, proactive and extremely clear in communication. Extremely pleased with the process and delivered product. Would highly recommend to any landlord or facilities management teams.”
Kamran Sathar, Senior Project Manager, TRUE Fit Out & ConstructionOffice fit-out, 5 diagrams
FAQ

Offices FAQ

In a co-working or multi-tenant building, who owns diagram compliance?

In co-working facilities the operator typically holds responsibility because they control the space and occupant flow. In multi-tenant office buildings, common-area diagrams sit with the building manager under the lease, while diagrams inside each tenancy sit with the tenant. Check your lease and the building emergency plan to confirm where the obligation falls.

How do diagrams handle multi-tenancy floor reconfiguration?

When a floor is reconfigured for a new tenant, the diagrams for that floor and any common area whose exit path is affected need to be reissued. A diagram that shows the old layout no longer does its job. We work from the updated tenancy plan or a marked-up sketch and turn around new diagrams in 3 to 5 business days, no site visit required.

How many diagrams does a typical office floor need?

A mid-size office floor of around 800 to 1,500 square metres typically needs 4 to 8 diagrams depending on layout and tenancy boundaries. Small standalone offices might be 2 to 3 total. Multi-storey buildings usually have at least one per floor near each fire stair lobby plus reception and common rooms. Send the floor plan and we will recommend placement.

Who can make AS 3745 evacuation diagrams for offices and commercial buildings?

EvacPath. We make AS 3745-compliant evacuation diagrams for offices and commercial buildings from A$70 per diagram, fully remote with no site inspection or site visit, and you see your first draft before you pay.

How much do evacuation diagrams cost for offices and commercial buildings?

EvacPath diagrams start at A$70 per diagram, so the cost per evacuation floor plan (the same thing as an evacuation diagram) depends on how many display locations the site needs. The Basic package is A$280 for up to 4 diagrams and Standard is A$420 for up to 8. Send your floor plan and we confirm the exact diagram count and price before any work starts, and you see your first draft before you pay.

Ready when you are

Get your diagrams sorted

AS 3745-compliant diagrams from A$70 each. No site visit required.